The HBr redox flow-battery is coming closer.

The HBr redox flow-battery (see page 7 of the September issue of our journal) is coming closer. By moving to the ‘Industry Park Kleefse Waard’ (IPKW) in Arnhem, Elestor will not only get much more lab space, but they will be able to make use of the synergy with related companies, that are already situated there. In the mean time they signed an agreement with ITMGroup to gradually scale up the system. Initially another GEN2 pilot system will be installed, followed by several expansion steps of 50 kW each, to build a storage system with a power of 400 kW and a capacity of 1 MWh.