Due to COVID restrictions a virtual tour on board the Sleipnir, as originally scheduled for the KIVI OT presentation on December 16, will unfortunately not be possible.

Heerema Marine Contractors has offered to present instead the results of the first test of floating installation of a wind turbine generator with Heerema’s  Rotor Nacelle Assembly (RNA) installation method using the Sleipnir installation vessel.

Heerema performed the demonstration project in collaboration with DOT and the Delft University of Technology (TU Delft) to collect valuable operational data and test installation methods and durations.

Presenters: Thijs Postma (Project Manager) and Rolf van Huffelen (Senior Project Engineer)

Joining the online event

KIVI OT members are warmly welcomed to join this online presentation! Please use the red button on the top right page to register, using your KIVI account. At Wednesday evening (15-12-2021) we will e-mail you the meeting link, which can be opened via Microsoft Teams or webbrowsers Microsoft Edge/Google Chrome.

Practical considerations
Please consider the following in preparation of the meeting:
• To be able to join, please make sure you have either Microsoft Edge or Google Chrome installed, or Microsoft Teams
• Questions can be posed in the chat window during the lecture itself
• A moderator will collect/combine/select questions from the chat window and pose them to the presenter at the end
• You are kindly requested to mute your microphone during the event, and to refrain from recording the lecture